The first phase of the Suzhou Municipal Solid Waste Incineration Power Plant Upgrading Project is located on Baodai West Road, Mudu Town, Wuzhong District, Suzhou City. The total construction area of the project is 53,636.58 square meters, with a curtain wall area of about 30,000 square meters. The building is an industrial plant, with the main factory building being a steel truss structure and the auxiliary building being a concrete frame structure. It has five floors above ground and one floor underground, with the highest point of the curtain wall reaching 59.9 meters. The curtain wall construction includes terracotta curtain walls, framed glass curtain walls, aluminum plate curtain walls, louvre curtain walls, glass canopies, etc.
The project is equipped with three 750-ton/day waste incineration lines and two 50 MW steam turbine generator sets. The daily waste processing capacity reaches 2,250 tons, and the "reduction, resource utilization, and harmlessness" benefits have been achieved in comprehensive waste treatment, with smoke emission meeting European standards. It is a key livelihood project in Suzhou in 2019.
Project Name: Curtain Wall Engineering of the First Phase of the Suzhou Municipal Solid Waste Incineration Power Plant Upgrading Project
Awarded Year: 2021-2022
Curtain Wall Project of the First Stage of the Upgrading and Transformation Project for Suzhou Municipal Solid Waste Incineration Power Generation Plant
Winning Time:2021-2022year